Website was updated on 12/19/2023

Tuftonboro & Wolfeboro,

New Hampshire


Dam Rebuilding Progress.

The Drawdown of the pond began on September 20, 2016.   The drawdown is in preparation for the Dam Rebuilding to begin on October 3, 2016. It appears that the pond is lowering approximately 2 inches per day.  The drought this summer has caused the water level for the pond to be very low.   The pictures below were taken on September 16th, prior to drawdown of the pond.  This page will provide members updates of the progress of the lowering of the pond water over the  drawdown period.  Once the rebuild begins, pictures will be added to provide members progress on the rebuild.



Second Beach

First Beach

September 19 Pictures